Williston traffic

Traffic delays because of road construction cause regular backups at the junction of Highways 85 and 2 outside the heart of Williston, N.D.

( Paresh Dave / Los Angeles Times / June 28, 2014 )

Traffic delays because of road construction cause regular backups at the junction of Highways 85 and 2 outside the heart of Williston, N.D.

  • Email E-mail
  • add to Twitter Twitter
  • add to Facebook Facebook