Sign up today and save up to 67% on a Hartford Courant digital subscription
CT Now

Rebuilding the Gerald Desmond bridge

A Port of Long Beach crew member pressure-sprays an old pipe that the team extracted from an abandoned oil well, in preparation for construction. The old oil well pipe has to be removed before they can pour pylons to support the new bridge. Bob Chamberlin / Los Angeles Times